Z Corp Design Approach

We Listen
- This is Your Project
- Involve All Parties to Set Goals
- Involve the Staff for Program Requirements
- Site Visit for Kick-Off Meeting/ Site inspection, existing facility inspections
- Keep You Informed Each Step of the Way
Programming Session On Site (FACD/ Charette)
- Assemble Design Team, Organize Agenda, Distribute Program Questionnaire, Set Schedules
- Architects and Engineers (Design Team) Develop Design Concepts
- Set Design Goals and Objectives with All Participants
- Establish a Confirmation of Findings with All Members
- Agree on Concept Direction with Endorsements
- Assures Project Delivered at Final Submittal meets Expectations

Z Corp Knowledge of Local Codes, Laws…
- Familiar with UBC and IBC (2000 ed.)
- Current DoD Anti-Terrorism/Force Protection (AT/FP) requirements
- Structural and Architectural design requirements for hurricane wind loads in the Eastern Atlantic Region
- Familiar with soils conditions at major Southeastern Atlantic Region DoD installations
- Familiar with DoD and State requirements for asbestos / lead-based paint testing and abatement
- Familiar with UFAS/ADA requirements, including special housing applications
- Familiar with Southeastern NC Construction capabilities

Z Corp Technical Capabilities (DOD)
- Construction Criteria Base (CCB)
- SPECSINTACT v3.1 and UFGS master specifications
- NAVFAC “SUCCESS” system in WBS v4.4
- ‘WIN’ESTIMATING
- Electronic Bid Submittal (EBS) for LANTDIV
- “Dr. Checks” Web-based Review Procedure
- Access to ACOE, and DOD Websites
- AutoDesk Architectural Desktop 3.3 (AutoCAD 2002) & Release 14
- MECcheck v3.0 Model Energy Code Compliance
- 3D Studio VIZ R 3.3
- Adobe Photoshop 6.0; Acrobat 5.0
- LEED’s Green Building Design Rating System
- Microsoft Office 2000
- Project 98
- Master Builder 7.0
- 2001 Norton Antivirus Corporate Edition